DAN CHANG BIO ENERGY PROJECT
(MITR PHOL / TJEL)
Steel Structure Fabrication and Installation of 400 tons.
Economizer Coil Installation CS 250 tons.
Ducts Installation 100 tons.
March, 2011 to July, 2011