TIE-IN AND MODIFY PIPE FOR REVAMP PROJECT AND OPERATION 2014

TIE-IN AND MODIFY PIPE FOR REVAMP PROJECT AND OPERATION 2014 (PTT PHENOL)
PACKAGE 31 PIPING CUT CHANG AND WELDING 2014 (PTT PHENOL / PTTME)

PTT Phenol Turn Around
Fabruary,2014 to March ,2014

Copyright © 2017. All rights reserved. Design by nanostudio