IMPROVEMENT OF WASTE WATER PUMPS FOR COAL OF WASTE WATER TREATMENT SYSTEM ( HPC )

FABRICATION AND INSTALLATION OF PLATFORM FOR DUCTING FAN UNIT#1-3 (HPC)

Client

-

Main contractor

-

Scope

Engineering (Shop drawing) Fabrication steel Structure 69 Tons
February, 2019 to May, 2019

Copyright © 2017. All rights reserved. Design by nanostudio