PASSENGER LIFT FOR CENTRAL ROOM PROJECT (HPC)

IMPROVEMENT OF WASTE WATER PUMPS FOR COAL OF WASTE WATER TREATMENT SYSTEM ( HPC )

Client

-

Main contractor

-

Scope

Design, supply, installation, testing and commissioning of Passenger lift for Central control room building
May, 2019 to September 2019

Copyright © 2017. All rights reserved. Design by nanostudio