THIRD TRANSFER AND SHIFTABLE, TRIPPER LINE 3 (GIANT TIRE & SERVICE)

THIRD TRANSFER AND SHIFTABLE, TRIPPER LINE 3 (GIANT TIRE & SERVICE)

Client

-

Main contractor

-

Scope

Fabrication Steel structure 30 Tons
August, 2022 to September, 2022

Copyright © 2017. All rights reserved. Design by nanostudio